The Original Five

It's well established that the oldest motorway service area can be found on the M1, but there has always been some confusion over exactly which one it is. This page aims to put an end to the misinformation which has made its way onto government websites, television documentaries and even the M1's own birthday celebrations, and it aims to tell the remarkable story of how the British motorway service station really was created at the same time.

Investigating the Options

Old Motorinn proposal.
A drawing of one of the massive buildings Motorinns were proposing.

It was early 1958 and the opening of the first section of the M1 was set to revolutionise travel between London and The Midlands. Hauliers were now raising concerns that a ban on private properties adjoining the motorway would mean there would be nowhere suitable for them to take a break, and that this meant they would have to stick to the old, congested A5 they knew well.

To tackle this, and to ensure the new road wouldn't be littered with broken down vehicles, five possible sites for rest areas were identified. These were:

Note that the road originally ran from today's J5 to J18. The SA Numbering System went on to be continued by most service stations over the following 20 years.

With no idea how businesses would feel about setting up on this unprecedented design of road, 300 interested catering and motoring firms were sent a questionnaire asking which of the five sites they would prefer, what facilities they would provide, and what regulations they felt would be appropriate. The Ministry planned to take the two most popular locations and develop them in more detail.

67 replies were received, with most proposing breakdown, repairs and first aid facilities, and asking for a long lease of up to 99 years. Some of the more unusual ideas came from Wall's ice cream, who were happy with a kiosk at Redbourn and Watford Gap, and from a firm called Motorinns, who were proposing five motels so large they would have left no space for anything else.

Amongst those replies were two now-familiar names: Northamptonshire-based recovery firm Blue Boar and a proposed partnership between Fortes and Blue Star. Both had come up with their first proposals for a new design of transport café, the latter's predictably being more lavish. Not so well-known was the most popular location: Redbourn had received the most votes, followed by Watford Gap. Nervous businesses evidently felt more trade would be found at the two ends of the road.

Armed with this information, the Ministry decided that the new M1 should have services at Redbourn and Watford Gap. This left a huge gap between facilities, so it was decided a small petrol station would be built at Newport Pagnell too. The remaining two sites would be bought but left empty until traffic levels required them.

It has been reported many times that British service stations were inspired by visits to those in Italy, Germany and North America. This is true, but their influence is exaggerated. Between the mid-1950s and mid-1970s many government foreign service station comparison trips were made, but they were mostly interested in the highway design and legal arrangements, rather than copying their building design.

Panic Stations

Demonstrating Watford Gap.
Service stations were new to the press too, so the winning design had to be demonstrated to them.

The whole creation of the service station had been an afterthought, and there was already a spanner in the works: objections from local residents meant the land at Redbourn couldn't be purchased. Rather than waste more time dealing with amendments and appeals, Redbourn was formally dropped from the plans. This left just two confirmed sites and a further two reserve sites. These sites were all deliberately tiny: the Ministry were worried that anything larger wouldn't be able to be filled. That was perhaps their biggest mistake yet.

By now it was April 1959 and work on the motorway had not only started, but wasn't far from completion. For vanity if nothing else, the government were keen to get the road open as quickly as possible. A revised list of firms interested in designing the first service area now stood at 64. Documents explaining the chosen sites and regulations were sent to them all, and those firms were asked to propose a design and a rent formula, which would be analysed by experts in finance, catering, business and highway design. The Ministry would pay for the landscaping and parking areas only.

The response to this is explained in detail on the Newport Pagnell and Watford Gap pages, but in short both sites received an impressive proposal from Motorway Services Ltd, the combined Blue Star and Fortes firm. However, they were given a run for their money at Watford Gap by Blue Boar, who had the added selling point that they would be able to recover vehicles from the motorway efficiently using their existing base in Watford village.

"There is a lot of pressure to support the small man but the big firms have the better proposals."
Ministry of Transport, 1959

It has been suggested many times that Blue Boar won Watford Gap as compensation for them losing existing business to the new motorway. Of the hundreds of businesses along the A5 who faced that problem, Blue Boar were the only one to come forward with a realistic proposal. They won the bid fair and square, but the opportunity to play on the fact they were sticking up for a little firm was not missed by the government of the time. Thanks to political spin, a myth was born.

The other reason Blue Boar were a good choice was that the Fortes/Blue Star favourites had suggested something which would impress the highest class of motorist. If that market share turned out not to exist, the government would lose out because both service stations would be paying a turnover-based rent. On the other hand Blue Boar's proposal was about providing basic catering to working-class lorry drivers. It is not true to suggest that one was designed for cars and the other for lorries, but the motorway service station as a concept was still an experiment and the two operators who had been selected each had completely different ideas of who would be visiting them.

Date-Check

Watford Gap 1960s.
The original building at Watford Gap won no awards for architecture, but it was a rushed job.

The new owners of the two services had been chosen, but their plans had to get through a lot more hurdles before they could be considered complete. The date was now September 1959, the motorway was expected to open in two months time, and the motorway's contractors did not even know where the car parks were supposed to be. Panic was about to become an emergency.

The two operators were asked to drop everything and instead work on urgent plans to get something ready to open with the motorway in November. Faced with the very real prospect of having to sell fuel from jerry cans, Blue Star (Newport Pagnell) managed to get something described as "reasonably attractive" open in time with a recovery truck, a small filling station and a temporary toilet block.

Blue Boar (Watford Gap) decided it would be easier if they built something which could be adapted into their final plans. They went on to be hampered by poor weather, failed deliveries and expensive earthworks, and were able to offer only fuel when the motorway opened on 2 November 1959. The toilet block opened a full two weeks later. Despite its reputation for being the oldest service station in the country, Watford Gap was two weeks late to the party. When it did open, its makeshift arrangement was described as "dull and depressing".

Borrowed Time

The motorway was open and it had toilets to be used. Remarkably, hiding behind all their publicity about how great the motorway was, the Ministry managed to avoid any complaints about the lack of food or late opening of the toilets. But that was a temporary situation and it was time to get the real plans going.

An agreement was reached that the permanent services would be complete in April 1960. That goal was missed and this time the Ministry were to blame as designs were slow to be approved and car parks were slow to be constructed. The actual opening dates were as follows:

"A most unusual and startlingly attractive restaurant."
Newport Pagnell visitor book, 1960
  • 15 August 1960: Newport Pagnell northbound café
  • 17 August 1960: Newport Pagnell northbound restaurant
  • 13 September 1960: Watford Gap northbound, and footbridge
  • 30 September 1960: Newport Pagnell southbound café
  • 1 October 1960: Watford Gap southbound café

Through August and September an agreement was reached which saw southbound traffic at Newport Pagnell use the rear access so they could park in the northbound car park, as the footbridge wasn't ready.

The new services were free to open whenever they liked, but chose to be open 24 hours, expecting a lot of overnight HGV trade. They were free to apply for a licence to serve alcohol with food.

Note that Newport Pagnell, which is often seen as the less successful brother of Watford Gap, once again beat it to the title of opening first.

A Grave Error

Toddington services.
Toddington required clever engineering to fit revised facilities onto such a small site.

By the Autumn of 1960 the new services were open. It is quite shocking then that by November 1960, Motorway Services Limited were requesting permission to extend Newport Pagnell.

The services had been built on the assumption that one in seven cars passing them would stop. The actual figure was one in four. Fortes' prestige and Blue Boar's rudimentary catering arrangements were both big hits with their two target audiences and they were unable to keep up with demand.

To add to the problems, another panic-stricken late change to policy had seen maintenance compounds placed next to service areas where land had been severed by road construction but wasn't being used. At Newport Pagnell, no such land was available, so it was taken from the tiny acreage reserved for the service area. Despite that, the Ministry were unhappy that their costs had spiralled, as what was built was somehow larger than what they had expected.

Meanwhile, much bigger problems had arisen away from the M1. Back in 1959, design work on parts of the M2, M5 and M6 were at an advanced stage. They had been hoping to learn lessons about service stations from Watford Gap and Newport Pagnell but with nothing open at the time, they had to nervously copy them. As a result, eight more severely undersized and unevaluated services were created. It is from this mould of panic that much of the service station as we know it was created.

With the situation at Newport Pagnell reaching another state of crisis and Redbourn still off the cards, a quick study of suitable sites concluded Toddington needed to be built quickly. It was actually treated as an overflow for Newport Pagnell. The other reserve site at Rothersthorpe opened in 1977.

Legacy

"We need to avoid the 'Watford Gap-Newport Pagnell' image."
Service station design meeting, 1972

When asked about motorway services in the 1960s, people will often talk about bold architecture and fine-dining restaurants. These followed the Newport Pagnell model, and Keele was actually described as "an improved Newport Pagnell". However, this style quickly went out of fashion, and most services since have copied the utilitarian style of Watford Gap, even if Watford Gap itself has been almost-entirely rebuilt. Newport Pagnell has its original building, albeit heavily extended.

Being a few miles from the northern end of Britain's only motorway made Watford Gap a memorable reference point. This, coupled with its catering being more tailored towards lorry drivers and groups of young men who made up many of the motorway users of the time, has made Watford Gap the more famous of the original two.

While the approach used on the M1 was used again to build a significant number of the service stations in the UK, over time almost every regulation and policy has changed. Some of the first changes were to allow only one brand of fuel to be sold, to ban alcohol and to buy much larger sites.

The history of the original five services is explored in more detail on their respective pages, and readers interested in this subject may also like to read about Forton, Leicester Forest East, Strensham, Keele, Charnock Richard, Knutsford and Farthing Corner.