Motorway Services Online

Retrieved from "https://motorwayservices.uk"

Solihull: Difference between revisions

m Current Plans: postponed again
 
m there is a widening strip
 
(45 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Unbuilt
{{Services
|name = Solihull
|type = planned
|road = [[M42]] around J4 and J5
|operator = Extra
|location = Solihull, West Midlands
|name = Solihull (Catherine-de-Barnes)
|dateplanned = 1970-2014
|image =  
|operator = [[Extra]], [[Welcome Break]], [[Roadchef]]
|road = [[M42]] at J5A (also accessible to traffic on the A4545)[[Category:2020s|Solihull {{#setmainimage:Solihull Extra sketch.jpg}}]]
|othernames = Catherine-de-Barnes, Friday Lane
|postcode = B92 0ES
|image = Catherine-de-Barnes Extra site.jpg
|signposted = It will be
|gridref = SP148757
|stype = Single site located at a junction
|coords  = 52.379404,-1.78309
|briefroad = M42 at J5A
|coords2 = 52.40663,-1.749315
|coords = 52.421882, -1.7246282
|coords3 = 52.422654,-1.722364
|markerpost = 0030 }}
|maplink = http://maps.google.co.uk/maps/ms?ie=UTF8&hl=en&msa=0&msid=105746665889585296418.00045989081a929a0c6f4&ll=52.396658,-1.745453&spn=0.074579,0.154324&z=13
[[File:M42 J5A site.jpg|200px|thumb|right|The location where the new M42 J5A is planned.|alt=M42 motorway.]]
|country = UK }}
Solihull could well be the location of Britain's next motorway service area. With over 50 years of planning debate behind it, it started out as one of the country's oldest!


Many services have been proposed along the eastern section of the M42 (J3a-J7), many of which took the name of '''Catherine-de-Barnes''' after the village nearest to most of them. They have all met tough opposition from local residents.
The Planning Inspectorate granted outline planning permission for the proposal on 11 March 2022. While this means it's now closer to coming to fruition than it ever has been, given the long history, it feels a bit early to declare it all a done deal. Extra have indicated that they expect preparation work to begin in {{current|early 2025}}, though there is still planning to be done.


The problem is that a lot traffic joins and leaves the M42 at these two junctions, and this 'motorway hopping' creates a long gap between [[Warwick]] and [[Hilton Park]] services. To try to address the problem, [[Hopwood Park|Hopwood Park services]] opened in 1999, but they were outside the area, being at J2.
==The Approved Service Area==
[[File:Solihull Walford Hall road layout.jpg|200px|thumb|right|alt=Walford Hall road layout.|Extra's planned road and site layout (as of 2016).]]
The approved location for the service area is '''Walford Hall Farm''', historically known as the '''Catherine-de-Barnes''' option, although it has been suggested that [[Extra]], the developer, will call it '''Solihull services'''.


There are additional problems because the M42 has frequent junctions and the use of hard shoulder running makes the motorway complicated enough as it already is, without extra exits being created. The road is mostly within green belt land.
The usual facilities will be provided including a large amenity building with a grass roof, a large lorry park, and a large petrol station. A footpath will connect it to Solihull Road. The adjacent building at Walford Hall Farm would have been brought into use as offices, requiring significant work as it is a listed building that is also derelict.


In 2019, two competing plans from Applegreen and Extra are set to be decided upon.
The national highway authority raised an unusual concern that the service area car park could be abused by airport and event traffic. This is likely to be addressed by a standard automated charging system. As a new service area, the authority asked them to confirm in writing their plans for electric vehicles.


==The Plans==
Detail on the new amenity building will become apparent in time, but you can expect a development similar to [[Leeds Skelton Lake]]. Extra have [https://www.solihullmotorwayservices.co.uk/ created a mini-site] for the project.
===Early Plans===
When the M42 was still being designed, an early decision was made to have a service area at '''Friday Lane''', in Catherine-de-Barnes. This was dropped in 1978 after getting caught up with several controversial suburban service station proposals, and the publication of the [[Prior Report]] suggested Green Belt land should be put first. Warwickshire Council were among the objectors.


The preferred location at Friday Lane couldn't be built because it would require a planned service road to the NEC to be moved, affecting the compulsory purchase order in place at the time.
===Access===
What makes this development unusual is that access will be provided via M42 J5A, a new interchange that hadn't been built when the site was approved. The theory is that England's national highway authority were already planning to build two roundabouts and south-facing slip roads here as part of their A4545 project. They insist that the roundabouts were always the plan, although a few people have asked why roundabouts were needed if it wasn't to pre-empt the surrounding land being sold to developers.


With responsibility for identifying sites for new motorway services being moved to the private sector, the M42 moved to the top of the list. Little is known about many of the proposals but it's thought that [[Roadchef]] and [[Welcome Break]] may have put applications in. Separate plans for services were put in in 1993, 1997, 1998 and 1999, including one to the north-east of J5.
In the event, Extra were willing to pay for the remaining slip roads, to allow people to enter and exit their service area. Had the planned A4545 been cancelled, Extra would have paid for something like M42 J5A to be built for their use anyway.


By the late 1990s the plans looked like this:
This raises a new problem: Extra's north-facing slip roads would be very close to M42 J6, creating a layout that is incompatible with the current 'part-time hard shoulder' road layout. Extra had suggested they would be willing to pay for the motorway layout to be changed to the current standards (and the government later said they wanted to do this anyway), but this was then cancelled due to political issues. It's still not clear what the solution is, but the highway authority have requested that 67 metres be left free for future motorway widening.
* [[Roadchef]]/[[Blue Boar]] applied for the site between J5 and J6.
* [[Extra]] applied for the site at J5.
* Another developer had applied for the site at J4.


===Extra Plan===
There have been further issues with the  new junction. In order to handle all the service area traffic, engineers declared that the brand new roundabouts would now need traffic lights and up to four lanes. This raises further questions about exactly how building two small roundabouts was ever deemed to be the optimum solution, and how long this layout will actually work for. Service stations on small roundabouts have a bad history, as [[Cherwell Valley|the M40]] knows well.
In 2001 [[Extra]] put in a plan to build a service area to the west of the M42 between J5 and J6, south of the B4102 bridge. There would have been a bridge so southbound traffic could access the services. This was rejected but went to appeal in 2009, where it was again rejected. In both cases it was rejected on environmental grounds, following a big campaign from local residents.


===Other Plan===
Issues with the junction are somewhat inevitable. This section of the M42 functions as a long-distance motorway, an urban commuter route and a development corridor, all at the same time, resulting in closely-spaced junctions, all of which are overloaded and constrained by their position in leafy green belt areas on the urban fringe. The planning history is detailed below but, suffice to say, the Planning Inspectorate ruled that the drawbacks with building at M42 J5A were overruled by the benefits and that this location was better than the alternatives.
At the same time as the Extra plan, another developer applied to build a service area to the east of M42 J4, accessed via the A3400. This too went to appeal and was rejected because of traffic concerns. The building here would have been smaller, but the car park would have had 570 spaces.


===Current Plans===
Despite this, residents have been vociferous in their objection to service areas here, having previously formed the group "Solihull Against Motorway Service Areas", and now nearly 800 people signed an online petition saying they didn't want the project to happen.
It was presumed that when the previous two plans were rejected again, the whole thing would just drop. However, in January 2010 the Highways Agency published a document looking at the locations of services, and it suggested that building a service area on this stretch of the M42 should be the highest priority.


In December 2014, Extra applied for plans as "Solihull" between J5 and J6, around the same area that [[Roadchef]] and [[Blue Boar]] had tried around 20 years previous. This has its own [http://www.solihullmotorwayservices.co.uk/ project page].
==Planning History==
{{fulldetails|History:M42|M42 Service Area Planning}}
It's quite incredible that this ongoing proposal dates back to at least 1969.


Meanwhile, in July 2016, [[Applegreen]] announced they were looking to take advantage of the unpopularity of the proposals by planning something much more discreet here. Their plan will be exhibited from 26 July 2016, which involves extensive highway work in the eastern corner of J4, to create a service area with a large grass roof.
The most recent developments began in 2013, with Extra going public with their Walford Hall plan. Inevitably this was badly received by its neighbours, so in 2016 [[Applegreen]], who were keen to break into the British market, went public with a proposal for a service area at M42 J4. The two proposals would be debated together, which meant a very long wait, as there were several technical issues to be determined.


In 2017, Highways England finalised plans to make substantial changes to M42 J5. The proposed layout has been specifically designed to ensure space is left for a potential new service area, wherever it may be.
Both proposals were unanimously rejected by Solihull Metropolitan Council in 2021, with concerns raised about the loss of green belt land, and also about road safety on the M42. Some councillors weren't convinced that a new service area was needed. The Planning Inspectorate ruled in March 2022 that the Extra plan could be justified, but that the Applegreen proposal could not, even if it was the only option on the table.


After dragging on for a while, the two plans were set to be examined in a special session of the planning committee on 27 March 2019. However on 25 March Applegreen asked for a delay, to allow them to accommodate new information from Highways England. Highways England had previously requested their plan be refused due to poor highway design. On 7 June 2019, Highways England signalled that a special session of the planning committee would have to be postponed a second time.
===Applegreen Plan===
[[File:Solihull Box Tree road layout.jpg|200px|thumb|right|alt=Box Tree road layout.|Applegreen's planned road and site layout.]]
Applegreen's plan was designed to be discreet. It would be smaller than the Extra plan, and smaller than the previous plan at this junction. Access would have been provided directly from the roundabout, with an exit onto Gate Lane.


{{bottomnav|nonav=true|comments=Applegreen|version=new}}
It was to be built on the eastern side of M42 J4, at '''Box Tree Farm'''. It had been suggested that this would be called "Shirley services".
[[Category:M42]][[Category:1990s]][[Category:2000s]][[Category:2010s]][[Category:Roadchef]][[Category:Welcome Break]][[Category:Extra]]
 
A large grass roof would be provided, covering both the building at the petrol station. There would also be a drive thru coffee shop. After Applegreen acquired Welcome Break, it was decided that this would open as a Welcome Break service area.
 
Highways England had technical reservations about Applegreen's plan to integrate the site with the very busy roundabout at J4, which caused a lengthy delay to the planning process.
 
===The Full Story===
When the M42 here was being planned, there was going to be a service area called "Friday Lane". It would have been positioned on both sides of the motorway near Catherine-de-Barnes, and the proposal prompted complaints from residents. In 1971 and 1973 it was discussed in the press, and described as being about 60 acres in size. Complaints were mainly attributed to people from Hampton in Arden.
 
When the M42 opened in 1976 there was no evidence of a service area having been planned here. In 1978, the Department of Transport confirmed that they were now planning to build a service area a few miles to the north of here. Called [[Black Firs]], it would be positioned between J6 and J7, and the announcement confirmed that Friday Lane had been cancelled.
 
Black Firs had its land built on, and we then entered a period where motorway service area development across England ground to a halt, as the Department of Transport was occupied with other issues. In the mid-1980s, they encouraged developers to fulfil two deliberately vague contracts, which were named "M42 Northern Section" and "M42 Southern Section". The northern contract successfully led to the opening of [[Tamworth|Tamworth services]] in 1990, but this would be no use to traffic leaving the M42 for the M6.
 
====Privatised Era====
[[File:M42 ATM at Friday Lane.jpg|alt=Electronic signs over motorway.|200px|thumb|right|The Active Traffic Management system on the M42 that wasn't compatible with the plans.]]
In 1992, the responsibility for planning motorway service areas was moved from the government to the private sector, without the southern contract having ever been fulfilled.
 
The following year [[Blue Boar]] proposed building a service area at Walford Hall Farm (what's now the Extra site), which they hoped to have open by 1997. It would have involved building a new flyover to provide access to the M42. This would have been the M42's southern service area, as [[Hopwood Park]] didn't open until 1999, but the Walford Hall plan got stuck in the planning system.
 
With that still ongoing, in 1998 [[Extra]] planned a service area at M42 J5, and in 1999 Shirley Estates proposed a service area at Box Tree Farm (now the Applegreen site). The Shirley Estates plan would have involved adjusting the route of Stratford Road. Routes in and out of the Shirley service area would have passed through a large roundabout, and then exited via a large loop.
 
These three proposals were all taken to a public inquiry in 1999, where they were opposed by residents who formed the Say No Action Group (SNAG). In 2001, the Secretary of State refused permission for the Shirley Estates and Extra plans for being inappropriate development in the green belt, but was "minded to give permission" to the Blue Boar/Walford Hall plan. This permission was never given, but it did set a precedent that a new motorway service area was needed.
 
In 2001, Shirley Estates submitted an updated version of their scheme. This would have been positioned further from Stratford Road. Another big change was that Extra confirmed that they had permission from Blue Boar to pursue the Walford Hall Farm proposal. Blue Boar had been taken over by [[Roadchef]] in 1998, so it's not clear exactly when that permission was granted, or whether Roadchef had actually been representing the scheme during that first inquiry.
 
John Prescott reopened the inquiry in 2005, saying circumstances had changed. The main change was that in 2006 the new Active Traffic Management system (the forerunner to what's now called a "smart motorway") was going to open. The new inquiry refused the new Shirley Estates plan, and also refused the outstanding Walford Hall Farm plan on the basis that it wasn't compatible with the new layout for the M42. The schemes were opposed by residents who formed the Solihull Against Motorway Service Areas Group (SAMSAG).
 
Unfortunately for Extra those perceived safety risks were only an issue there and then. A few years later smart motorways would happily be built around frequent exits and service areas with no concerns raised. At the time the 'smart motorway' was still a novel concept that even highway officials were unsure of, so they didn't want to make things any riskier.
 
Some may have expected the rejection of all three options in 2009 to draw a line under the matter. Things were soon kicked back into action when the Highways Agency published a list of gaps between motorway service areas in 2010. The gap on the M42 (specifically between [[Warwick]] and [[Hilton Park]]) was highlighted by them as the most urgent issue that needed resolving.
 
Extra began working on two options which could be built at Walford Hall Farm in 2013. The design was updated to reflect new ways of thinking, with additions such as the green roof. They were presented to the public in 2014, and one of them was eventually granted planning permission in 2022.
 
==Alternatives==
{{Succession start}}
{{Succession|1|M42|
[[Hopwood Park]] (13 miles){{newline}}[[Warwick]] (M40, 23 miles) |
[[Tamworth]] (15 miles){{newline}}[[Hilton Park]] (M6 north-west, 26 miles){{newline}}[[Corley]] (M6 south-east, 12 miles){{newline}}[[Norton Canes]] (M6 Toll, 24 miles){{newline}}[[Telford]] (M54, 40 miles) }}
</table>
 
{{bottomnav}}
{{notopen}}
[[Category:M42]][[Category:1990s]]

Latest revision as of 00:57, 10 January 2025

Solihull (Catherine-de-Barnes)
Road:M42 at J5A (also accessible to traffic on the A4545)

(open map)
Signposted from the road?It will be
Services type:Single site located at a junction

⚠️ Please note that this service area is not yet open.


M42 motorway.
The location where the new M42 J5A is planned.

Solihull could well be the location of Britain's next motorway service area. With over 50 years of planning debate behind it, it started out as one of the country's oldest!

The Planning Inspectorate granted outline planning permission for the proposal on 11 March 2022. While this means it's now closer to coming to fruition than it ever has been, given the long history, it feels a bit early to declare it all a done deal. Extra have indicated that they expect preparation work to begin in early 2025, though there is still planning to be done.

The Approved Service Area

Walford Hall road layout.
Extra's planned road and site layout (as of 2016).

The approved location for the service area is Walford Hall Farm, historically known as the Catherine-de-Barnes option, although it has been suggested that Extra, the developer, will call it Solihull services.

The usual facilities will be provided including a large amenity building with a grass roof, a large lorry park, and a large petrol station. A footpath will connect it to Solihull Road. The adjacent building at Walford Hall Farm would have been brought into use as offices, requiring significant work as it is a listed building that is also derelict.

The national highway authority raised an unusual concern that the service area car park could be abused by airport and event traffic. This is likely to be addressed by a standard automated charging system. As a new service area, the authority asked them to confirm in writing their plans for electric vehicles.

Detail on the new amenity building will become apparent in time, but you can expect a development similar to Leeds Skelton Lake. Extra have created a mini-site for the project.

Access

What makes this development unusual is that access will be provided via M42 J5A, a new interchange that hadn't been built when the site was approved. The theory is that England's national highway authority were already planning to build two roundabouts and south-facing slip roads here as part of their A4545 project. They insist that the roundabouts were always the plan, although a few people have asked why roundabouts were needed if it wasn't to pre-empt the surrounding land being sold to developers.

In the event, Extra were willing to pay for the remaining slip roads, to allow people to enter and exit their service area. Had the planned A4545 been cancelled, Extra would have paid for something like M42 J5A to be built for their use anyway.

This raises a new problem: Extra's north-facing slip roads would be very close to M42 J6, creating a layout that is incompatible with the current 'part-time hard shoulder' road layout. Extra had suggested they would be willing to pay for the motorway layout to be changed to the current standards (and the government later said they wanted to do this anyway), but this was then cancelled due to political issues. It's still not clear what the solution is, but the highway authority have requested that 67 metres be left free for future motorway widening.

There have been further issues with the new junction. In order to handle all the service area traffic, engineers declared that the brand new roundabouts would now need traffic lights and up to four lanes. This raises further questions about exactly how building two small roundabouts was ever deemed to be the optimum solution, and how long this layout will actually work for. Service stations on small roundabouts have a bad history, as the M40 knows well.

Issues with the junction are somewhat inevitable. This section of the M42 functions as a long-distance motorway, an urban commuter route and a development corridor, all at the same time, resulting in closely-spaced junctions, all of which are overloaded and constrained by their position in leafy green belt areas on the urban fringe. The planning history is detailed below but, suffice to say, the Planning Inspectorate ruled that the drawbacks with building at M42 J5A were overruled by the benefits and that this location was better than the alternatives.

Despite this, residents have been vociferous in their objection to service areas here, having previously formed the group "Solihull Against Motorway Service Areas", and now nearly 800 people signed an online petition saying they didn't want the project to happen.

Planning History

See also: M42 Service Area Planning

It's quite incredible that this ongoing proposal dates back to at least 1969.

The most recent developments began in 2013, with Extra going public with their Walford Hall plan. Inevitably this was badly received by its neighbours, so in 2016 Applegreen, who were keen to break into the British market, went public with a proposal for a service area at M42 J4. The two proposals would be debated together, which meant a very long wait, as there were several technical issues to be determined.

Both proposals were unanimously rejected by Solihull Metropolitan Council in 2021, with concerns raised about the loss of green belt land, and also about road safety on the M42. Some councillors weren't convinced that a new service area was needed. The Planning Inspectorate ruled in March 2022 that the Extra plan could be justified, but that the Applegreen proposal could not, even if it was the only option on the table.

Applegreen Plan

Box Tree road layout.
Applegreen's planned road and site layout.

Applegreen's plan was designed to be discreet. It would be smaller than the Extra plan, and smaller than the previous plan at this junction. Access would have been provided directly from the roundabout, with an exit onto Gate Lane.

It was to be built on the eastern side of M42 J4, at Box Tree Farm. It had been suggested that this would be called "Shirley services".

A large grass roof would be provided, covering both the building at the petrol station. There would also be a drive thru coffee shop. After Applegreen acquired Welcome Break, it was decided that this would open as a Welcome Break service area.

Highways England had technical reservations about Applegreen's plan to integrate the site with the very busy roundabout at J4, which caused a lengthy delay to the planning process.

The Full Story

When the M42 here was being planned, there was going to be a service area called "Friday Lane". It would have been positioned on both sides of the motorway near Catherine-de-Barnes, and the proposal prompted complaints from residents. In 1971 and 1973 it was discussed in the press, and described as being about 60 acres in size. Complaints were mainly attributed to people from Hampton in Arden.

When the M42 opened in 1976 there was no evidence of a service area having been planned here. In 1978, the Department of Transport confirmed that they were now planning to build a service area a few miles to the north of here. Called Black Firs, it would be positioned between J6 and J7, and the announcement confirmed that Friday Lane had been cancelled.

Black Firs had its land built on, and we then entered a period where motorway service area development across England ground to a halt, as the Department of Transport was occupied with other issues. In the mid-1980s, they encouraged developers to fulfil two deliberately vague contracts, which were named "M42 Northern Section" and "M42 Southern Section". The northern contract successfully led to the opening of Tamworth services in 1990, but this would be no use to traffic leaving the M42 for the M6.

Privatised Era

Electronic signs over motorway.
The Active Traffic Management system on the M42 that wasn't compatible with the plans.

In 1992, the responsibility for planning motorway service areas was moved from the government to the private sector, without the southern contract having ever been fulfilled.

The following year Blue Boar proposed building a service area at Walford Hall Farm (what's now the Extra site), which they hoped to have open by 1997. It would have involved building a new flyover to provide access to the M42. This would have been the M42's southern service area, as Hopwood Park didn't open until 1999, but the Walford Hall plan got stuck in the planning system.

With that still ongoing, in 1998 Extra planned a service area at M42 J5, and in 1999 Shirley Estates proposed a service area at Box Tree Farm (now the Applegreen site). The Shirley Estates plan would have involved adjusting the route of Stratford Road. Routes in and out of the Shirley service area would have passed through a large roundabout, and then exited via a large loop.

These three proposals were all taken to a public inquiry in 1999, where they were opposed by residents who formed the Say No Action Group (SNAG). In 2001, the Secretary of State refused permission for the Shirley Estates and Extra plans for being inappropriate development in the green belt, but was "minded to give permission" to the Blue Boar/Walford Hall plan. This permission was never given, but it did set a precedent that a new motorway service area was needed.

In 2001, Shirley Estates submitted an updated version of their scheme. This would have been positioned further from Stratford Road. Another big change was that Extra confirmed that they had permission from Blue Boar to pursue the Walford Hall Farm proposal. Blue Boar had been taken over by Roadchef in 1998, so it's not clear exactly when that permission was granted, or whether Roadchef had actually been representing the scheme during that first inquiry.

John Prescott reopened the inquiry in 2005, saying circumstances had changed. The main change was that in 2006 the new Active Traffic Management system (the forerunner to what's now called a "smart motorway") was going to open. The new inquiry refused the new Shirley Estates plan, and also refused the outstanding Walford Hall Farm plan on the basis that it wasn't compatible with the new layout for the M42. The schemes were opposed by residents who formed the Solihull Against Motorway Service Areas Group (SAMSAG).

Unfortunately for Extra those perceived safety risks were only an issue there and then. A few years later smart motorways would happily be built around frequent exits and service areas with no concerns raised. At the time the 'smart motorway' was still a novel concept that even highway officials were unsure of, so they didn't want to make things any riskier.

Some may have expected the rejection of all three options in 2009 to draw a line under the matter. Things were soon kicked back into action when the Highways Agency published a list of gaps between motorway service areas in 2010. The gap on the M42 (specifically between Warwick and Hilton Park) was highlighted by them as the most urgent issue that needed resolving.

Extra began working on two options which could be built at Walford Hall Farm in 2013. The design was updated to reflect new ways of thinking, with additions such as the green roof. They were presented to the public in 2014, and one of them was eventually granted planning permission in 2022.

Alternatives

Previous:Next:
Hopwood Park (13 miles)
Warwick (M40, 23 miles)
Services on the M42Tamworth (15 miles)
Hilton Park (M6 north-west, 26 miles)
Corley (M6 south-east, 12 miles)
Norton Canes (M6 Toll, 24 miles)
Telford (M54, 40 miles)

Visitor Feedback

Visitors can leave public feedback on their experience by logging into the CommentBox app. You can do so quickly below:


Views expressed in these comments are those of the individual contributor. User accounts are managed by CommentBox.io. Registration helps prevent automated spam.
We ask the companies named to check here, but we can't force them to do so.