Motorway Services Online

Retrieved from "https://motorwayservices.uk"

Solihull: Difference between revisions

m These 13 hour days are having an impact on me
a rewrite was deserved
Line 1: Line 1:
{{Planned
{{Services
|type = planned
|operator = Extra
|name = Solihull (Catherine-de-Barnes)
|image =  
|image =  
|road = [[M42]] at J4 and at J5A
|road = [[M42]] at J5A (also accessible to traffic on the A4545)
|location = Solihull, West Midlands
|postcode = B92 0
|dateplanned = 1969-2021
|maplink = https://www.google.co.uk/maps/@52.421882,-1.7246282,15.7z
|gridref = SP148757
|signposted = It will be
|operator = [[Extra]] or [[Welcome Break]]
|stype = Single site located at a junction.
|coords = 52.421882,-1.7246282
|briefroad = M42 at J5A
|coords2 = 52.379712,-1.7820060
|coords = 52.421882, -1.7246282
|country = UK }}
|markerpost = 0030 }}
[[File:M42 J5A site.jpg|200px|thumb|right|The location where the new M42 J5A is planned.|alt=M42 motorway.]]
[[File:M42 J5A site.jpg|200px|thumb|right|The location where the new M42 J5A is planned.|alt=M42 motorway.]]
''This page is about the service areas currently planned around Solihull. For other services on the M42, see [[M42|Services on the M42]].''
Solihull could well be the location of Britain's next motorway service area. With over 50 years of planning debate behind it, it started out as one of the country's oldest!


On 11 March 2022, The Planning Inspectorate awarded planning permission for a new motorway service area to be built at the new M42 J5A, also known as "Extra's plan", "Walford Hall" or "the Catherine-de-Barnes option".
The Planning Inspectorate granted outline planning permission for the proposal on 11 March 2022. While this means it's now closer to coming to fruition than it ever has been, given the long history, it feels a bit early to declare it all a done deal.


At the same time, planning permission was refused for a rival proposal to be built at M42 J4, known as "Applegreen's plan", "Box Tree" or "the Shirley option". The inquiry judged this proposal to be not just the inferior one of the two, but unsuitable in its own right.
==The Approved Service Area==
[[File:Solihull Walford Hall road layout.jpg|200px|thumb|right|alt=Walford Hall road layout.|Extra's planned road and site layout (as of 2016).]]
The approved location for the service area is '''Walford Hall Farm''', historically known as the '''Catherine-de-Barnes''' option, although it has been suggested that [[Extra]], the developer, will call it '''Solihull services'''.


This decision has been a long time coming, and there have been plenty of twists to the tale so far. For the time being, this page will describe both proposals that were on the table, even if at the moment only the Extra one is expected to be built. In theory the motorway regulations would have allowed both to be built if deemed necessary, but green belt regulations mean that a clear and compelling need for the development has to be established, and that would be very unlikely to happen twice.
The usual facilities will be provided including a large amenity building with a grass roof, a large lorry park, and a large petrol station. A footpath will connect it to Solihull Road. The adjacent building at Walford Hall Farm would have been brought into use as offices, requiring significant work as it is a listed building that is also derelict.


Solihull Metropolitan Council had voted unanimously to reject both proposals in 2021, with concerns raised about the loss of green belt land, and also about road safety on the M42. Some councillors weren't convinced that a new service area was needed.
Detail on the new amenity building will become apparent in time, but you can expect a development similar to [[Leeds Skelton Lake]]. Extra have [http://www.solihullmotorwayservices.co.uk/ created a mini-site] for the project.


Before that, Solihull's planning department had recommended that councillors approve the Extra (Walford Hall) plan, and refuse the Applegreen (Box Tree) plan, on the basis that Extra's plan to build at J5A was more evenly spaced.
===Access===
What makes this development unusual is that access will be provided via M42 J5A, a new interchange that hasn't been built yet. The theory is that England's national highway authority were already planning to build two roundabouts and south-facing slip roads here as part of their A4545 project. They insist that the roundabouts were always the plan, although a few people have asked why they would have been needed if Highways England weren't trying to pre-empt the surrounding land being sold to developers.


==Extra Plan==
In the event, Extra were willing to pay for the remaining slip roads, to allow people to enter and exit their service area. Had the planned A4545 been cancelled, Extra would have paid for M42 J5A to be built for their use anyway. This raises a new problem: Extra's north-facing slip roads would be very close to M42 J6, creating a layout that would be incompatible with the current 'part-time hard shoulder' road layout. Extra had suggested they would be willing to pay for the motorway layout to be changed to the current standards (and the government later made this their intention too), but the current government policy is that no changes to smart motorways are allowed before 2025. All of this means Solihull services can't possibly open before that date.
[[File:Solihull Walford Hall road layout.jpg|200px|thumb|right|alt=Walford Hall road layout.|Extra's planned road and site layout.]]
The [[Extra]] plan involved building a new interchange on the M42 to the north of Solihull Road. A new dual carriageway would have run from the western roundabout, under Solihull Road, to the new service area by '''Walford Hall Farm''', known as the '''Catherine-de-Barnes''' option.


The usual facilities would have been provided including a large amenity building with a grass roof, a large lorry park, and a large petrol station. A footpath would connect to Solihull Road. The adjacent building at Walford Hall Farm would have been brought into use as offices, requiring significant work as it is a listed building that is also derelict.
There have been further issues with the junction. In order to handle all the service area traffic, engineers declared that the brand new roundabouts would now need traffic lights and up to four lanes. This raises further questions about exactly what circumstances building two small roundabouts was ever deemed to be the optimum solution.


What made this development unusual was that Highways England were also planning to build a new interchange here. Their new M42 J5A would only have slip roads facing the south, but includes roundabouts that Extra's service area can be connected to. Extra were willing to pay for the remaining slip roads, and even for the interchange if the M42 J5A plan is cancelled. Extra were also willing to fund the conversion of the M42 to 'All Lane Running' to support the new interchange; the government's new announcement on smart motorways means that no new 'All Lane Running' motorways are allowed until 2025, so the new service area cannot be built until then either.
Issues with the junction are somewhat inevitable. This section of the M42 functions as a long-distance motorway, an urban commuter route and a development corridor, all at the same time, resulting in closely-spaced junctions, all of which are overloaded and positioned in leafy green belt areas on the urban fringe. The planning history is detailed below but, suffice to say, the Planning Inspectorate ruled that the drawbacks with building at M42 J5A were overruled by the benefits and that this location was better than the alternatives.


There had been some debate about the safety of this road layout, with the new slip roads leaving very little space between J5A and J6. After escalating the issue to their most senior engineer, Highways England concluded that any safety risks would be outweighed by the benefit to road safety brought about by the scheme. Incredibly, to be able to handle the traffic in a way planners find acceptable, the brand new roundabouts would be provided with several sets of traffic lights and up to four lanes.
Despite this, residents have been vociferous in their objection to service areas here, having previously formed the group "Solihull Against Motorway Service Areas", and now nearly 800 people have signed an online petition saying they don't want the project to happen.


[http://www.solihullmotorwayservices.co.uk/ Extra's plan] was revealed to the public with a public consultation in December 2014. The planning process was drawn out because it wanted to be debated along with the rival proposal below.
==Planning History==
It's quite incredible that this ongoing proposal dates back to 1969.


This site has a long planning history, as is explained later on. Residents have been vociferous in their objection to service areas here, having previously formed the group "Solihull Against Motorway Service Areas", and now nearly 800 people have signed an online petition saying they don't want the project to happen.
The most recent developments began in 2014, when Extra went public with their Walford Hall plan. Inevitably this was badly received by its neighbours, so in 2016 [[Applegreen]], who were keen to break into the British market, went public with a proposal for a service area at M42 J4. The two proposals would be debated together, which meant a very long wait, as there were several technical issues to be determined.


==Applegreen Plan==
Both proposals were unanimously rejected by Solihull Metropolitan Council in 2021, with concerns raised about the loss of green belt land, and also about road safety on the M42. Some councillors weren't convinced that a new service area was needed. The Planning Inspectorate ruled in March 2021 that the Extra plan could be justified, but that the Applegreen proposal could not, even if it was the only option on the table.
[[File:Solihull Box Tree road layout.jpg|200px|thumb|right|alt=Walford Hall road layout.|Applegreen's planned road and site layout.]]
Knowing that the Extra plan had its objectors, in July 2016 [[Applegreen]] went public with their plan to build a service area at the eastern side of M42 J4, at '''Box Tree Farm'''. It had been suggested that this would be called "Shirley services".


===Applegreen Plan===
[[File:Solihull Box Tree road layout.jpg|200px|thumb|right|alt=Box Tree road layout.|Applegreen's planned road and site layout.]]
Applegreen's plan was designed to be discreet. It would be smaller than the Extra plan, and smaller than the previous plan at this junction. Access would have been provided directly from the roundabout, with an exit onto Gate Lane.
Applegreen's plan was designed to be discreet. It would be smaller than the Extra plan, and smaller than the previous plan at this junction. Access would have been provided directly from the roundabout, with an exit onto Gate Lane.


A large grass roof would be provided, covering both the building at the petrol station. There would also be a drive thru coffee shop.
It was to be built on the eastern side of M42 J4, at '''Box Tree Farm'''. It had been suggested that this would be called "Shirley services".


At the time of the application, Applegreen were keen to break into the UK motorway market. They had since achieved this by purchasing [[Welcome Break]]. If built, it would have carried the Welcome Break name, and hold their franchises.
A large grass roof would be provided, covering both the building at the petrol station. There would also be a drive thru coffee shop. After Applegreen acquired Welcome Break, it was decided that this would open as a Welcome Break service area.


Highways England had technical reservations about Applegreen's plan to integrate the site with the very busy roundabout at J4, which caused a lengthy delay to the planning process.
Highways England had technical reservations about Applegreen's plan to integrate the site with the very busy roundabout at J4, which caused a lengthy delay to the planning process.


==Planning History==
===The Full Story===
[[File:M42 ATM at Friday Lane.jpg|alt=Electronic signs over motorway.|200px|thumb|right|The Active Traffic Management system on the M42 that wasn't compatible with the plans.]]
Incredibly, debate about a possible service area in this area goes back at least as far as 1969, meaning this must be one of the longest-running planning debates in UK infrastructure history.
 
When the M42 here was being planned, there was going to be a service area called "Friday Lane". It would have been positioned on both sides of the motorway near Catherine-de-Barnes, and the proposal prompted complaints from residents. In 1971 and 1973 it was discussed in the press, and described as being about 60 acres in size. Complaints were mainly attributed to people from Hampton in Arden.
When the M42 here was being planned, there was going to be a service area called "Friday Lane". It would have been positioned on both sides of the motorway near Catherine-de-Barnes, and the proposal prompted complaints from residents. In 1971 and 1973 it was discussed in the press, and described as being about 60 acres in size. Complaints were mainly attributed to people from Hampton in Arden.


Line 58: Line 60:
Black Firs had its land built on, and we then entered a period where motorway service area development across England ground to a halt, as the Department of Transport was occupied with other issues. In the mid-1980s, they encouraged developers to fulfil two deliberately vague contracts, which were named "M42 Northern Section" and "M42 Southern Section". The northern contract successfully led to the opening of [[Tamworth|Tamworth services]] in 1990, but this would be no use to traffic leaving the M42 for the M6.
Black Firs had its land built on, and we then entered a period where motorway service area development across England ground to a halt, as the Department of Transport was occupied with other issues. In the mid-1980s, they encouraged developers to fulfil two deliberately vague contracts, which were named "M42 Northern Section" and "M42 Southern Section". The northern contract successfully led to the opening of [[Tamworth|Tamworth services]] in 1990, but this would be no use to traffic leaving the M42 for the M6.


===Privatised Era===
====Privatised Era====
[[File:M42 ATM at Friday Lane.jpg|alt=Electronic signs over motorway.|200px|thumb|right|The Active Traffic Management system on the M42 that wasn't compatible with the plans.]]
In 1992, the responsibility for planning motorway service areas was moved from the government to the private sector, without the southern contract having ever been fulfilled.
In 1992, the responsibility for planning motorway service areas was moved from the government to the private sector, without the southern contract having ever been fulfilled.


Line 75: Line 78:
Some may have expected the rejection of all three options in 2009 to draw a line under the matter. Things were soon kicked back into action when the Highways Agency published a list of gaps between motorway service areas in 2010. The gap on the M42 (specifically between [[Warwick]] and [[Hilton Park]]) was highlighted by them as the most urgent issue that needed resolving.
Some may have expected the rejection of all three options in 2009 to draw a line under the matter. Things were soon kicked back into action when the Highways Agency published a list of gaps between motorway service areas in 2010. The gap on the M42 (specifically between [[Warwick]] and [[Hilton Park]]) was highlighted by them as the most urgent issue that needed resolving.


In 2014, Extra presented two options which could be built at Walford Hall Farm. The design was updated to reflect new ways of thinking, such as the green roof. The hotel was removed from the plan, and the building was moved closer to the hill. Meanwhile in 2016 Applegreen brought a smaller and more discreet proposal for Box Tree Farm to the table. These were both refused in February 2021, but with both Applegreen and Extra intending to appeal, the issue is still ongoing.
In 2014, Extra presented two options which could be built at Walford Hall Farm. The design was updated to reflect new ways of thinking, with additions such as the green roof.
 
==Alternatives==
{{Succession start}}
{{Succession|1|M42| [[Tamworth]] (15 miles){{newline}}[[Hilton Park]] (M6 north-west, 26 miles){{newline}}[[Corley]] (M6 south-east, 12 miles){{newline}}[[Norton Canes]] (M6 Toll, 24 miles){{newline}}[[Telford]] (M54, 40 miles) |
[[Hopwood Park]] (13 miles){{newline}}[[Warwick]] (M40, 23 miles) }}
</table>


{{bottomnav|nonav=true|comments=Applegreen|version=new}}
{{bottomnav|nonav=true|comments=Applegreen}}
[[Category:M42]][[Category:1990s|Solihull {{#setmainimage:Solihull Extra sketch.jpg}}]][[Category:2000s]][[Category:2010s]][[Category:Extra]][[Category:Welcome Break]][[Category:Welcome Break comments]][[Category:Extra comments]]
[[Category:M42]][[Category:1990s|Solihull {{#setmainimage:Solihull Extra sketch.jpg}}]][[Category:2000s]][[Category:2010s]][[Category:Extra]][[Category:Welcome Break]][[Category:Welcome Break comments]][[Category:Extra comments]]

Revision as of 12:14, 4 April 2022

Solihull (Catherine-de-Barnes)
Road:M42 at J5A (also accessible to traffic on the A4545)

(open map)
Signposted from the road?It will be
Services type:Single site located at a junction.

⚠️ Please note that this service area is not yet open.


M42 motorway.
The location where the new M42 J5A is planned.

Solihull could well be the location of Britain's next motorway service area. With over 50 years of planning debate behind it, it started out as one of the country's oldest!

The Planning Inspectorate granted outline planning permission for the proposal on 11 March 2022. While this means it's now closer to coming to fruition than it ever has been, given the long history, it feels a bit early to declare it all a done deal.

The Approved Service Area

Walford Hall road layout.
Extra's planned road and site layout (as of 2016).

The approved location for the service area is Walford Hall Farm, historically known as the Catherine-de-Barnes option, although it has been suggested that Extra, the developer, will call it Solihull services.

The usual facilities will be provided including a large amenity building with a grass roof, a large lorry park, and a large petrol station. A footpath will connect it to Solihull Road. The adjacent building at Walford Hall Farm would have been brought into use as offices, requiring significant work as it is a listed building that is also derelict.

Detail on the new amenity building will become apparent in time, but you can expect a development similar to Leeds Skelton Lake. Extra have created a mini-site for the project.

Access

What makes this development unusual is that access will be provided via M42 J5A, a new interchange that hasn't been built yet. The theory is that England's national highway authority were already planning to build two roundabouts and south-facing slip roads here as part of their A4545 project. They insist that the roundabouts were always the plan, although a few people have asked why they would have been needed if Highways England weren't trying to pre-empt the surrounding land being sold to developers.

In the event, Extra were willing to pay for the remaining slip roads, to allow people to enter and exit their service area. Had the planned A4545 been cancelled, Extra would have paid for M42 J5A to be built for their use anyway. This raises a new problem: Extra's north-facing slip roads would be very close to M42 J6, creating a layout that would be incompatible with the current 'part-time hard shoulder' road layout. Extra had suggested they would be willing to pay for the motorway layout to be changed to the current standards (and the government later made this their intention too), but the current government policy is that no changes to smart motorways are allowed before 2025. All of this means Solihull services can't possibly open before that date.

There have been further issues with the junction. In order to handle all the service area traffic, engineers declared that the brand new roundabouts would now need traffic lights and up to four lanes. This raises further questions about exactly what circumstances building two small roundabouts was ever deemed to be the optimum solution.

Issues with the junction are somewhat inevitable. This section of the M42 functions as a long-distance motorway, an urban commuter route and a development corridor, all at the same time, resulting in closely-spaced junctions, all of which are overloaded and positioned in leafy green belt areas on the urban fringe. The planning history is detailed below but, suffice to say, the Planning Inspectorate ruled that the drawbacks with building at M42 J5A were overruled by the benefits and that this location was better than the alternatives.

Despite this, residents have been vociferous in their objection to service areas here, having previously formed the group "Solihull Against Motorway Service Areas", and now nearly 800 people have signed an online petition saying they don't want the project to happen.

Planning History

It's quite incredible that this ongoing proposal dates back to 1969.

The most recent developments began in 2014, when Extra went public with their Walford Hall plan. Inevitably this was badly received by its neighbours, so in 2016 Applegreen, who were keen to break into the British market, went public with a proposal for a service area at M42 J4. The two proposals would be debated together, which meant a very long wait, as there were several technical issues to be determined.

Both proposals were unanimously rejected by Solihull Metropolitan Council in 2021, with concerns raised about the loss of green belt land, and also about road safety on the M42. Some councillors weren't convinced that a new service area was needed. The Planning Inspectorate ruled in March 2021 that the Extra plan could be justified, but that the Applegreen proposal could not, even if it was the only option on the table.

Applegreen Plan

Box Tree road layout.
Applegreen's planned road and site layout.

Applegreen's plan was designed to be discreet. It would be smaller than the Extra plan, and smaller than the previous plan at this junction. Access would have been provided directly from the roundabout, with an exit onto Gate Lane.

It was to be built on the eastern side of M42 J4, at Box Tree Farm. It had been suggested that this would be called "Shirley services".

A large grass roof would be provided, covering both the building at the petrol station. There would also be a drive thru coffee shop. After Applegreen acquired Welcome Break, it was decided that this would open as a Welcome Break service area.

Highways England had technical reservations about Applegreen's plan to integrate the site with the very busy roundabout at J4, which caused a lengthy delay to the planning process.

The Full Story

When the M42 here was being planned, there was going to be a service area called "Friday Lane". It would have been positioned on both sides of the motorway near Catherine-de-Barnes, and the proposal prompted complaints from residents. In 1971 and 1973 it was discussed in the press, and described as being about 60 acres in size. Complaints were mainly attributed to people from Hampton in Arden.

When the M42 opened in 1976 there was no evidence of a service area having been planned here. In 1978, the Department of Transport confirmed that they were now planning to build a service area a few miles to the north of here. Called Black Firs, it would be positioned between J6 and J7, and the announcement confirmed that Friday Lane had been cancelled.

Black Firs had its land built on, and we then entered a period where motorway service area development across England ground to a halt, as the Department of Transport was occupied with other issues. In the mid-1980s, they encouraged developers to fulfil two deliberately vague contracts, which were named "M42 Northern Section" and "M42 Southern Section". The northern contract successfully led to the opening of Tamworth services in 1990, but this would be no use to traffic leaving the M42 for the M6.

Privatised Era

Electronic signs over motorway.
The Active Traffic Management system on the M42 that wasn't compatible with the plans.

In 1992, the responsibility for planning motorway service areas was moved from the government to the private sector, without the southern contract having ever been fulfilled.

The following year Blue Boar proposed building a service area at Walford Hall Farm (what's now the Extra site), which they hoped to have open by 1997. It would have involved building a new flyover to provide access to the M42. This would have been the M42's southern service area, as Hopwood Park didn't open until 1999, but the Walford Hall plan got stuck in the planning system.

With that still ongoing, in 1998 Extra planned a service area at M42 J5, and in 1999 Shirley Estates proposed a service area at Box Tree Farm (now the Applegreen site). The Shirley Estates plan would have involved adjusting the route of Stratford Road. Routes in and out of the Shirley service area would have passed through a large roundabout, and then exited via a large loop.

These three proposals were all taken to a public inquiry in 1999. In 2001, the Secretary of State refused permission for the Shirley Estates and Extra plans for being inappropriate development in the green belt, but was "minded to give permission" to the Blue Boar/Walford Hall plan. This permission was never given.

In 2001, Shirley Estates submitted an updated version of their scheme. This would have been positioned further from Stratford Road. Another big change was that Extra confirmed that they had permission from Blue Boar to pursue the Walford Hall Farm proposal. Blue Boar had been taken over by Roadchef in 1998, so it's not clear exactly when that permission was granted, or whether Roadchef had actually been representing the scheme during that first inquiry.

In 2005 John Prescott reopened the inquiry, saying circumstances had changed. The main change was that in 2006 the new Active Traffic Management system (the forerunner to what's now called a 'smart motorway') was going to open. The new inquiry refused the new Shirley Estates plan, and also refused the outstanding Walford Hall Farm plan on the basis that it wasn't compatible with the new layout for the M42.

Unfortunately for Extra those perceived safety risks were only an issue there and then. A few years later smart motorways would happily be built around frequent exits and service areas with no concerns raised. At the time the 'smart motorway' was still a novel concept that even highway officials were unsure of, so they didn't want to make things any riskier.

Some may have expected the rejection of all three options in 2009 to draw a line under the matter. Things were soon kicked back into action when the Highways Agency published a list of gaps between motorway service areas in 2010. The gap on the M42 (specifically between Warwick and Hilton Park) was highlighted by them as the most urgent issue that needed resolving.

In 2014, Extra presented two options which could be built at Walford Hall Farm. The design was updated to reflect new ways of thinking, with additions such as the green roof.

Alternatives

Previous:Next:
Tamworth (15 miles)
Hilton Park (M6 north-west, 26 miles)
Corley (M6 south-east, 12 miles)
Norton Canes (M6 Toll, 24 miles)
Telford (M54, 40 miles)
Services on the M42Hopwood Park (13 miles)
Warwick (M40, 23 miles)

Visitor Feedback

Visitors can leave public feedback on their experience by logging into the CommentBox app. You can do so quickly below:


Views expressed in these comments are those of the individual contributor. User accounts are managed by CommentBox.io. Registration helps prevent automated spam.
We ask the companies named to check here, but we can't force them to do so.